# Kexin Factory Guangdong

> Kexin protective case factory in Guangdong: 12,000 m², 6 PP/ABS injection lines, 2 aluminum CNC, 1 foam CNC, 2 assembly lines. ISO 9001 certified.

Human-readable page: https://oembox.beeaa.com/en/factory/
Site overview for AI agents: https://oembox.beeaa.com/llms.txt

## Page content

12,000 m² production area, 6 PP/ABS injection lines, 2 aluminum CNC lines, 1.5M cases per year — Guangdong, China.

B2B only — wholesale, import, brand & industry. No retail. EXW / FOB Shenzhen / Ningbo.

## 5 Key Takeaways about Kexin Production

1. 12,000 m² factory floor in Guangdong with 6 PP/ABS injection lines
2. 2 aluminum CNC machining lines for premium cases
3. 1.5M cases per year — 10 containers per month capacity
4. ISO 9001:2015 certified, AQL 1.0/2.5 quality control
5. On-site visits welcome — Guangzhou airport, 60 min from factory

## Factory location & size

Our main factory is strategically located in Guangdong, China — the heartland of the Chinese injection molding and protective case industry. Total production area spans 12,000 m², with 6 PP/ABS injection lines, 2 aluminum CNC lines, 1 foam CNC line, and 2 assembly lines. Annual capacity: 1.5 million protective cases.

## Production facilities

- **Injection molding:** 6 PP/ABS lines, 50–2000 ton clamping force, shot weight 50g–15kg, automated robotic arms.
- **CNC machining:** 2 aluminum lines, 5-axis machining, ±0.05mm tolerance, surface treatment (anodizing, powder coating).
- **Foam:** CNC polyurethane (PU) / polyethylene (PE) / EVA cutting, water jet, contour-precise cutouts.
- **Assembly:** 2 lines, hinge/latch installation, hardware integration, foam fitting.
- **Quality lab:** Drop tower, IP test tank, salt spray, UV resistance, AQL inspection.

## Production process

1. **CAD design & DFM review** — 3D model, wall thickness, latch, material recommendation.
2. **Tooling build & T1 sample** — Aluminum or steel tooling, T1 sample 7–10 days.
3. **PP/ABS injection molding** — Robotic arm, 30–45 day production.
4. **Foam cutting (CNC/water jet)** — Contour-precise cutouts for devices, ±0.1mm.
5. **Assembly & quality control (AQL)** — Hardware, foam, inspection.
6. **Packaging & shipping** — Standard carton or custom, EXW / FOB Shenzhen / Ningbo.

## Factory visits

We welcome B2B customers to our factory. Factory visits are arranged with at least 14 days advance notice. During the visit, you can tour our injection lines, CNC machines, foam cutting facilities, assembly lines, and quality lab. On-site or nearby hotel accommodation, airport pickup from Shenzhen / Guangzhou can be arranged.

## Videos from the factory

175 real clips from production and testing: injection moulding, foam fitting, drop, water and load tests. Material, dimensions and workmanship are visible on screen — the most reliable basis for a quotation.

[Open the video library](https://oembox.beeaa.com/en/videos/)

## Quality standards & compliance

Kexin New Material operates a 12,000 m² production area in Guangdong with 6 PP/ABS injection production lines, 2 aluminum CNC production lines, 1 foam CNC line, and 2 assembly lines. Annual capacity: 1.5 million cases. Our production line follows a documented AQL 1.0/2.5 sampling system per ISO 2859-1, a 4-stage QC chain (IQC → IPQC → FQC → OQC), IP67/IP68 water ingress tests per IEC 60529, and MIL-STD-810H environmental testing. Standard certificates: CE, RoHS 2/3, REACH, ISO 9001:2015.

### 7-step OEM process

Our standard OEM process follows 7 steps: ① Briefing & quote (24 h) → ② DFM & 3D CAD → ③ Sample 7–10 days → ④ Tooling from USD 3,000 → ⑤ Mass production 30–45 days → ⑥ AQL quality control → ⑦ EXW Guangdong or FOB Shenzhen / Ningbo. Tooling from USD 3,000 one-time, MOQ 500 pieces for Pantone color and logo.

### Frequently asked questions

![Kexin Guangdong factory assembly line](https://oembox.beeaa.com/images/factory/factory-main.webp) ![Kexin PP injection molding workshop in Guangdong](https://oembox.beeaa.com/images/factory/factory-pp-workshop.webp) ![CNC foam cutting at Kexin factory](https://oembox.beeaa.com/images/factory/factory-foam-cnc.webp) ![Kexin protective case assembly line](https://oembox.beeaa.com/images/factory/factory-assembly.webp) **Where is the factory?** Main factory in Guangdong, China — the heartland of the Chinese injection molding and protective case industry. 12,000 m² production area. **Can I visit the factory?** Yes, factory visits with at least 14 days advance notice via email to kexin@beeaa.com. Pickup from Shenzhen / Guangzhou airports can be arranged. **Which certificates does the factory hold?** ISO 9001:2015, CE, RoHS 2/3, REACH. MIL-STD-810H test reports on request.

## More resources

[**Wholesale** Volume tiers 500+](https://oembox.beeaa.com/en/wholesale/) [**Distributors** 18 regions available](https://oembox.beeaa.com/en/distributors/) [**OEM / ODM** 7 steps, from USD 3,000](https://oembox.beeaa.com/en/oem/) [**Case studies** 8 industries](https://oembox.beeaa.com/en/cases/) [**Quality** 12 tests, AQL 1.0](https://oembox.beeaa.com/en/quality/) [**RFQ** 4-step inquiry](https://oembox.beeaa.com/en/rfq/)

## Related guides

Practical background reading on this topic, written by our engineering team.

[China protective case factory audit — B2B buyer checklist 2026 Complete factory audit checklist for B2B buyers sourcing protective cases from China. Pre-shipment inspection (PSI), qua](https://oembox.beeaa.com/en/blog/china-protective-case-factory-audit-b2b-buyer-checklist-2026/)[China Protective Case Factory Tour: What B2B Buyers Should Verify B2B buyers visiting China case factories should verify 8 critical points: tooling, materials, QC station, certifications](https://oembox.beeaa.com/en/blog/china-protective-case-factory-tour-what-to-expect/)[How Kexin Engineers Your Custom Protective Case Behind the scenes of our 6-step OEM/ODM process: CAD design, DFM review, tooling, injection, foam, QC.](https://oembox.beeaa.com/en/blog/how-kexin-engineers-custom-cases/)
