# Shipping – EXW Guangdong, FOB Shenzhen/Ningbo

> Kexin shipping: EXW Guangdong or FOB Shenzhen/Ningbo standard. 30–45 day sea freight, 15–25 day air freight. CIF/DAP via third-party forwarder available.

Human-readable page: https://oembox.beeaa.com/en/shipping/
Site overview for AI agents: https://oembox.beeaa.com/llms.txt

## Page content

EXW Guangdong or FOB Shenzhen / Ningbo. CIF / DAP via third-party forwarder. 30–45 day sea freight, 15–25 day air freight.

B2B only — wholesale, import, brand & industry. No retail. EXW / FOB Shenzhen / Ningbo.

## 5 Key Takeaways about shipping & delivery

1. EXW Guangdong (self-pickup) — standard for B2B
2. FOB Shenzhen / Ningbo (standard ocean freight) — standard for B2B
3. 28–35 day sea freight to Hamburg / Rotterdam / Antwerp
4. 15–25 day air freight for samples (4–7 day DHL Express)
5. CIF / DAP via third-party forwarder on request (no end-customer DDP)

## Shipping options (Incoterms 2020)

We offer flexible Incoterms 2020 shipping options for our B2B customers. Standard is EXW Guangdong (customer pickup at our factory) or FOB Shenzhen / Ningbo. CIF and DAP can be arranged via third-party forwarder.

- **EXW Guangdong** — Customer picks up goods at our factory. Customer handles customs, import and inland logistics.
- **FOB Shenzhen / Ningbo** — We deliver to the named port of shipment, customer from there. Customer arranges sea freight.
- **CIF** — Sea or air freight to destination port via forwarder.
- **DAP** — Available on request via a third-party forwarder. The customer remains importer of record and bears customs duty and import charges.
- **DDP** — Not offered — Kexin does not act as importer of record. Customs clearance and import duties are the buyer's responsibility.

## Lead times

- **Sample production** — 7–10 days
- **Air freight from China** — 15–25 days
- **Sea freight from China** — 30–45 days
- **OEM/ODM** — 30–45 days after artwork approval

## Packaging

Standard export carton with foam insert, poly bag, and outer carton. Custom packaging (brand logo, barcode, multi-language labels) available on request. Carton sizes optimized for 20'GP / 40'GP / 40'HQ container standards.

## Quality standards & compliance

Kexin New Material operates a 12,000 m² production area in Guangdong with 6 PP/ABS injection production lines, 2 aluminum CNC production lines, 1 foam CNC line, and 2 assembly lines. Annual capacity: 1.5 million cases. Our production line follows a documented AQL 1.0/2.5 sampling system per ISO 2859-1, a 4-stage QC chain (IQC → IPQC → FQC → OQC), IP67/IP68 water ingress tests per IEC 60529, and MIL-STD-810H environmental testing. Standard certificates: CE, RoHS 2/3, REACH, ISO 9001:2015.

### 7-step OEM process

Our standard OEM process follows 7 steps: ① Briefing & quote (24 h) → ② DFM & 3D CAD → ③ Sample 7–10 days → ④ Tooling from USD 3,000 → ⑤ Mass production 30–45 days → ⑥ AQL quality control → ⑦ EXW Guangdong or FOB Shenzhen / Ningbo. Tooling from USD 3,000 one-time, MOQ 500 pieces for Pantone color and logo.

### Frequently asked questions

![Kexin trolley transport case](https://oembox.beeaa.com/images/series/trolley-transport.webp) **Which Incoterms do you offer?** Standard: EXW Guangdong factory or FOB Shenzhen / Ningbo. CIF and DAP can be arranged via third-party forwarder. **How long does sea freight take?** 30–45 days from Shenzhen / Ningbo to Europe. Air freight 15–25 days. Samples by express 7–10 days. **Can I use my own forwarder?** Yes, many B2B customers use their own forwarders. We deliver EXW or FOB and hand over to your forwarder.

## More resources

[**Wholesale** Volume tiers 500+](https://oembox.beeaa.com/en/wholesale/) [**Distributors** 18 regions available](https://oembox.beeaa.com/en/distributors/) [**OEM / ODM** 7 steps, from USD 3,000](https://oembox.beeaa.com/en/oem/) [**Case studies** 8 industries](https://oembox.beeaa.com/en/cases/) [**Quality** 12 tests, AQL 1.0](https://oembox.beeaa.com/en/quality/) [**RFQ** 4-step inquiry](https://oembox.beeaa.com/en/rfq/)

## Related guides

Practical background reading on this topic, written by our engineering team.

[Shipping to Europe: EXW vs FOB — Which Is Right for You? Understand FOB, CIF, and DDP shipping terms to Europe. Cost, risk, customs, VAT, lead time compared.](https://oembox.beeaa.com/en/blog/shipping-to-europe-exw-fob/)[First-time protective case importer from China — 2026 B2B guide First-time B2B importer guide: how to find supplier, sample order, negotiation, payment, quality control, shipping, cust](https://oembox.beeaa.com/en/blog/first-time-protective-case-importer-china-guide-2026/)[Sourcing Protective Cases from China: A Buyer's Guide How to source IP67/IP68 protective cases from China: factory audit, MOQ, lead time, payment, quality, shipping.](https://oembox.beeaa.com/en/blog/sourcing-protective-cases-from-china/)
