5 Key Takeaways about shipping & delivery
- EXW Guangdong (self-pickup) — standard for B2B
- FOB Shenzhen / Ningbo (standard ocean freight) — standard for B2B
- 28–35 day sea freight to Hamburg / Rotterdam / Antwerp
- 15–25 day air freight for samples (4–7 day DHL Express)
- CIF / DAP via third-party forwarder on request (no end-customer DDP)
Shipping options (Incoterms 2020)
We offer flexible Incoterms 2020 shipping options for our B2B customers. Standard is EXW Guangdong (customer pickup at our factory) or FOB Shenzhen / Ningbo. CIF and DAP can be arranged via third-party forwarder.
- EXW Guangdong — Customer picks up goods at our factory. Customer handles customs, import and inland logistics.
- FOB Shenzhen / Ningbo — We deliver to the named port of shipment, customer from there. Customer arranges sea freight.
- CIF — Sea or air freight to destination port via forwarder.
- DAP — Available on request via a third-party forwarder. The customer remains importer of record and bears customs duty and import charges.
- DDP — Not offered — Kexin does not act as importer of record. Customs clearance and import duties are the buyer's responsibility.
Lead times
- Sample production — 7–10 days
- Air freight from China — 15–25 days
- Sea freight from China — 30–45 days
- OEM/ODM — 30–45 days after artwork approval
Packaging
Standard export carton with foam insert, poly bag, and outer carton. Custom packaging (brand logo, barcode, multi-language labels) available on request. Carton sizes optimized for 20'GP / 40'GP / 40'HQ container standards.
Quality standards & compliance
Kexin New Material operates a 12,000 m² production area in Guangdong with 6 PP/ABS injection production lines, 2 aluminum CNC production lines, 1 foam CNC line, and 2 assembly lines. Annual capacity: 1.5 million cases. Our production line follows a documented AQL 1.0/2.5 sampling system per ISO 2859-1, a 4-stage QC chain (IQC → IPQC → FQC → OQC), IP67/IP68 water ingress tests per IEC 60529, and MIL-STD-810H environmental testing. Standard certificates: CE, RoHS 2/3, REACH, ISO 9001:2015.
7-step OEM process
Our standard OEM process follows 7 steps: ① Briefing & quote (24 h) → ② DFM & 3D CAD → ③ Sample 7–10 days → ④ Tooling from USD 3,000 → ⑤ Mass production 30–45 days → ⑥ AQL quality control → ⑦ EXW Guangdong or FOB Shenzhen / Ningbo. Tooling from USD 3,000 one-time, MOQ 500 pieces for Pantone color and logo.
Frequently asked questions
Which Incoterms do you offer?
Standard: EXW Guangdong factory or FOB Shenzhen / Ningbo. CIF and DAP can be arranged via third-party forwarder.
How long does sea freight take?
30–45 days from Shenzhen / Ningbo to Europe. Air freight 15–25 days. Samples by express 7–10 days.
Can I use my own forwarder?
Yes, many B2B customers use their own forwarders. We deliver EXW or FOB and hand over to your forwarder.
More resources
Related guides
Practical background reading on this topic, written by our engineering team.
Shipping to Europe: EXW vs FOB — Which Is Right for You?
Understand FOB, CIF, and DDP shipping terms to Europe. Cost, risk, customs, VAT, lead time compared.
First-time protective case importer from China — 2026 B2B guide
First-time B2B importer guide: how to find supplier, sample order, negotiation, payment, quality control, shipping, cust
Sourcing Protective Cases from China: A Buyer's Guide
How to source IP67/IP68 protective cases from China: factory audit, MOQ, lead time, payment, quality, shipping.