GUIDE 2026-09-04
China protective case factory audit — B2B buyer checklist 2026
5 Key Takeaways: China protective case factory audit — B2B buyer checklist 20
- Topic: guide — industry context for B2B buyers and procurement teams
- Date: 2026-09-04 — current standards, certifications and market conditions
- Applications: protective cases for industrial tools, MRO, photography, drones, defense, medical devices, marine, audio
- Procurement: MOQ 500 pieces per Pantone color, 30–45 days lead time after tooling approval, CE/RoHS/REACH/ISO 9001/BSCI
- Shipping: EXW Guangdong (pickup) or FOB Shenzhen / Ningbo (sea freight). 28–35 days to Hamburg / Rotterdam
A factory audit is non-negotiable for B2B buyers sourcing protective cases from China. 70% of disputes originate from inadequate pre-shipment verification. This checklist covers everything from facility inspection to IP protection.
Phase 1: Desktop audit (1-2 weeks before site visit)
Document review
- Business license (business license) — verify with SAMR.gov.cn
- Export license (import-export qualification)
- ISO 9001:2015 certificate (issue date + validity + issuing body)
- BSCI / Sedex audit report (most recent, within 12 months)
- ISO 14001 environmental (if claimed)
- Product liability insurance (USD 1M+ minimum)
- Financial statements (2 years) — verify via Tianyancha or Qichacha
- Litigation history (court records, arbitration cases)
- List of major customers (verify with reference calls)
- Equipment list with year of manufacture
Sanctions check
- Entity not on BIS Entity List, OFAC SDN, EU restrictive lists
- No ITAR-controlled production without US State Department registration
- Beneficial ownership check (avoid military end-use)
Phase 2: On-site facility audit (1-2 days)
Reception & paperwork
- Reception by senior management (sales manager min)
- Business card + ID for all key contacts
- Facility floor plan / production line layout
- Live sample of similar product (not pre-prepared)
- Production capacity table per line
Production floor
- Production line count (expect 5+ for serious factory)
- Equipment age (injection molding machines 5-10 years is normal)
- Production schedule board (current week / month visible)
- Worker count per shift (typical 30-80 for medium factory)
- Workers wearing PPE, hairnets, gloves (medical-grade work)
- Workstation organization (5S visible)
Quality control
- IQC station (incoming material inspection) — should have calibrated calipers, scales, spectrophotometer
- IPQC station (in-process) — sample pull at each molding cycle
- FQC station (final inspection) — AQL 2.5 sampling, document recording
- OQC station (pre-shipment) — final random pull, 1-2% sample
- QC documentation retention (5 years typical)
- AQL samples archived per batch (look for boxes labeled with date/batch)
Materials storage
- PP / ABS / aluminum warehouse (climate-controlled, <30°C, <60% RH)
- Foam storage (separated, sealed from UV)
- FIFO rotation visible (old stock at front)
- MSDS for all materials on file (Chinese + English)
Test equipment
- IP67 test chamber (1m depth, 30 min) — mandatory for IP67 claims
- IP68 test chamber (3m depth) — for 8-series and 9-series
- Drop test rig (1.2m height, multiple orientations) — for MIL-STD-810H
- Compression tester (ASTM D642) — for crush rating
- Vibration table (IEC 60068-2-6) — for transport simulation
- Salt spray chamber (ISO 9227) — for marine certification
- Spectrophotometer (Pantone color match)
- Calibrated reference standards (ISO 17025 traceability)
Process capabilities
- Cpk ≥ 1.33 for critical dimensions (wall thickness, latch force, hinge torque)
- First Pass Yield (FPY) ≥ 95% (industry good: 98%+)
- Internal scrap rate < 2% (industry good: < 1%)
- Customer return rate < 1% over 12 months
Phase 3: Working conditions & social compliance
- Worker age ≥ 18 (Chinese labor law)
- Working hours ≤ 60/week (Chinese labor law, 44 standard)
- Overtime pay (1.5x weekday, 2x weekend, 3x holiday)
- Social insurance (5 insurances + 1 housing fund) — check receipts
- Dormitory condition (if foreign workers on site)
- Canteen / kitchen hygiene
- Fire exits clearly marked and unobstructed
- Fire extinguishers current (annual inspection date visible)
- First aid kits on each floor
- No discrimination, harassment, child labor (BSCI / Sedex verifies this)
Phase 4: IP protection & confidentiality
- Separate production line for customer-specific tooling (visible in tool room)
- Locked customer-specific mold storage (key access control)
- CCTV in mold room, no customer access without escort
- NCNDA (Non-Compete + NDA) signed for OEM customer-specific designs
- Tool ownership registered in customer name (visible on mold plate)
- No reverse engineering of competing products on same line
- Customer samples stored in separate locked area, not mixed with competitors
Phase 5: Commercial verification
- Factory ownership verified (Qichacha / Tianyancha)
- No undisclosed parent / subsidiary relationships
- Payment terms clearly documented (avoid 100% upfront for new suppliers)
- Letter of Authorization to act as agent (if applicable)
- Force majeure clause reasonable (no unlimited liability)
- Quality guarantee clause (refund / replace for defects)
Red flags (immediate reject)
- No business license, or expired
- Refuses to allow factory walkthrough (cameras off-limits, restricted areas)
- Workers in poor condition (visible fatigue, lack of PPE)
- Storage areas messy, no FIFO, materials exposed
- No calibrated test equipment, only claims
- Production in unrelated building (not actual factory)
- Quality claims without documentation (no batch records, no AQL)
- Reluctant to sign NDA before design disclosure
- Major customer references unverifiable (all "OK" but no details)
- Litigation history with foreign customers (search court records)
- Pressure to pay 100% upfront before sampling
Pre-Shipment Inspection (PSI) — third-party
For first 3 orders, mandatory PSI:
- AQL 2.5 sampling per ISO 2859-1, General Inspection Level II
- Sample size: 50-125 units per batch (depending on lot size)
- Test: visual (defects, color match, label accuracy), functional (latch, hinge, foam fit), dimensional (10 key measurements vs. spec)
- Cost: USD 300-500 per man-day, 1-2 days for typical 1,000-piece order
Recommended PSI firms (China)
- SGS (global) — most expensive, highest credibility
- Bureau Veritas (global) — strong in EU compliance
- Intertek (global) — fast turnaround
- Asia Inspection (Asia-focused) — competitive pricing
- HQTS (Hangzhou) — German-speaking auditors
- TÜV Rheinland (Shenzhen office) — European brand credibility
Production monitoring (between sampling and shipment)
- 30% deposit at order confirmation (NOT 100%)
- 30% before mass production start (after sample approval)
- 30% before shipment (after PSI pass)
- 10% net 30 days after delivery (or held as warranty hold)
Bottom line
A thorough factory audit takes 1-2 days on site + 1-2 weeks document review. Kexin factory in Guangdong passes BSCI and ISO 9001:2015 audits since 2018. We welcome B2B buyers for facility tours any time. Recommended stay: 2 nights, 1 day audit, 1 day follow-up. Hotel: Hilton Guangzhou (USD 80-120/night) or Hyatt Regency Dongguan (USD 100-150/night).